By signing in or creating an account, some fields will auto-populate with your information and your submitted forms will be saved and accessible to you.

Building Inspection Request

  1. Building Inspection Request

  2. Please provide the correct Building Permit Number. Only ONE building permit can be requested at a time.

  3. Building Permit # Example
    Building Permit Number Example

    Your building permit number can be located on your job card. An issued Building Permit is required prior to requesting an inspection.

  4. Inspections Requested

  5. Non-construction Certificate of Occupancy

  6. Pre-Construction

    Required for tenant improvements over 3,000 square feet and for new commercial buildings.

  7. Miscellaneous

  8. Utilities

  9. Pre-Concrete

  10. Pools

  11. Finals

  12. Rough Inspections

  13. Walls

  14. Solar

    ATTENTION:
    Confirm that you have the CORRECT permit number. Solar finals and panel upgrades are separate permit numbers.

    Solar inspections are not available on Fridays.

  15. This is an inspection request. Inspections are assigned on a first come first served basis and are conducted M-F with the exception of solar inspections which are not available on Fridays. All panel upgrades require a separate permit.

  16. We are now scheduling for:

    TUESDAY, DEC. 10th. Requests before this date will not be accepted and you will need to resubmit.

  17. If you request an inspection date before the above "scheduling for" date, your request will not be accepted and you will need to resubmit for an available date.

  18. Reminder: You will only be notified if the schedule becomes full.



    Inspection Window:
    If you would like an inspection window, please call 951-240-4202 between 7 a.m. and 8 a.m. the day of your inspection to determine your inspection window.

    By initialing below, I understand that I must call between 7 a.m. and 8 a.m. the day of my scheduled inspection for an inspection window. Also, I understand that if I request an inspection for a date before the above "scheduling for" date, my request will not be accepted and I will need to resubmit for an available date.

  19. Point of Contact for Inspection

  20. Person Requesting Inspection / Repeat

  21. Leave This Blank:

  22. This field is not part of the form submission.